Industrial Metals building
Stone veneer wainscot installed around a new two-story commercial metal building, from bare sheathing to finished stone at the covered entry.
Our first project of the year. Nothing like a blank slate, and this is how a lot of our projects start: bare sheathing, snow still on the ground, and Dad out front scoping out the situation and sharing his years of wisdom. Did I mention Dad was 81 when we did this one and still showing up to jobs? He's amazing.
We ran stone veneer around the base of the building, working off the concrete stem wall up to the belt line under the windows. About halfway through, all was going smooth and the temperature shot up quick. The first few days required freeze precautions and then we were dealing with heat. All in a day's work for a mason. We do cherish those perfect 65 degree days with no wind, but seldom see them.
Mom still pops in on occasion to keep us all in line.
Another happy customer! Masonry generally finishes well before the landscaping and the finishing touches do, so what you get at handover is a dirt yard and a traffic cone. Not glamorous, but that's the honest state of a building on the day the mason drives away.
Got something like this?
Tell me about it and I'll take a look. Free quote, no obligation.
Get a Free Quote